No-Go Remains

Aevum Pre-Deployment Readiness Report

Phase 0 validated. Release truth is cleaner, but deployment readiness remains blocked.

Report Date
2026-04-19
Report Version
v1.1
Assessment Result
No-Go
Validated Phase
Phase 0

1. PM Validation Result

Validated as Complete

  • Docs/06_Release_Control/Release_Baseline_Freeze_Note.md exists and correctly states package green / app build red / release blocked.
  • The false readiness watermark in Aevum_Architecture_Evolution_Log.html was corrected.
  • Repository narrative is cleaner than before and no longer broadly claims sign-off readiness.

Still Not Complete

  • Phase 0 does not change the technical release state.
  • App-level build is still red.
  • Identity, entitlement, privacy-manifest, and compliance blockers remain open.
  • Some historical docs still contain outdated or over-assertive architecture/release language and must be handled in later phases.

2. Current Readiness Matrix

AreaCurrent StateStatus
UIComponents package buildValidated greenGreen
IntelligenceEngine package buildValidated greenGreen
IntelligenceEngine package testsValidated greenGreen
App-level build / archiveStill not greenRed
Phase 0 baseline freezeValidated completeGreen
Product identity normalizationNot started / not validatedRed
Entitlement/App Store postureNot resolvedRed
Privacy manifestStill missing at app levelRed
Legal/privacy truthfulnessStill partially over-assertiveRed
GDPR / SOC 2 / ISO / DORA evidenceNot yet establishedRed

3. What Else Must Be Done

4. Specific Remaining Risks

RiskWhy It Matters
App build still redPackage health is not enough for TestFlight or App Store release.
MindTwin / Aevum naming driftCreates App Review, legal, metadata, and UX inconsistency risk.
High-risk entitlementsCan trigger App Review scrutiny or rejection if not justified.
Missing app privacy manifestCreates submission/privacy disclosure risk.
Cloudflare R2 model deliveryMust be disclosed accurately; absolute offline/local claims are unsafe while this remains true.
Overstated legal/compliance copyCreates trust, policy, and legal exposure.

5. Decision

Phase 0 PM decision: Accepted.
Deployment decision: No-Go remains in force.
Antigravity may proceed to Phase 1 only after treating this freeze note as the authoritative current truth.